Fernway Road Ditches

Fernway Road Ditches
Posted on 01/28/2011

Survey work has begun within the Fernway subdivision. The village has contracted with Christopher B. Burke Engineering Ltd. (CBBEL) to perform survey work along the roadways in the Fernway subdivsion. The survey work encompasses the ditches on the sides of the pavement with a few other locations in the right-of-ways for the streets. The survey work is being performed for the potential drainage improvements to the roadway ditches. The survey work will be completed by February 5th.